SIMULATION OF GOAL PROGRAMMING MODEL OF DIFFERENT PRIORITY STRUCTURES OF NIGERIAN PETROCHEMICAL INDUSTRY
Abstract
In this paper the goal programming (G.P.) model is applied to different priority structures to predict the structure of Nigerian downstream petrochemical industry. The primary aim is to be self sufficient in petrolchemicals through the selection of technologies that will minimize the total production cost and feedstock consumption. Therefore, the pre-emptive priority factors (P1i for i - 1,...,m, P2, P3, P4) in the multidimensional objective function the G.P. are chosen to be in accordance with the long terms objective of satisfying the demand locally.
On the tested priority structures, it is deduced that maximum goal target is a function of cost coefficient and demand while minimum goal target is a function of cost coefficient, demand and priority factor. It is noted that for the same goal target, most of the selected technologies are identical except for a few chemicals, it is preferable either to shift to another process or to simply import the chemicals.